Before a subcontractor starts work on your home, our engineers sit down with him on site to align standards, explain quality requirements and agree on the correct construction method, so you avoid common mistakes and personal improvisation from the start.

From 500 AED

  • On-site session with the contractor
  • Clear acceptance criteria from the start
  • Recommendations before construction
  • For all construction stages

One fixed price per stage, whatever the subcontractor.

Which Subcontractors?

We provide pre-planning before every stage that needs a clear agreement with the contractor, focusing on the points where mistakes keep recurring.

Formwork & Rebar Contractor

Foundations, tie beams, columns and slab.

  • Structural drawings
  • Rebar and stirrups
  • Levels
  • Cover spacers

Concrete Contractor

Before pouring each structural element.

  • Concrete type
  • Pouring equipment
  • Tests and samples
  • Curing

Blockwork Contractor

Before construction starts.

  • Axes and openings
  • Block and mortar type
  • Ties and lintels

Plaster Contractor

Before plastering starts.

  • Preparation before plaster
  • Acceptance criteria

Paint Contractor

Before painting starts.

  • Wall moisture
  • Number of coats
  • Protecting floors and doors

Gypsum Contractor

Before installing suspended ceilings.

  • Levels and design
  • Hangers and framing
  • Access panels

Stone Contractor

Before installing facade stone.

  • Fixing method
  • Stone layout
  • Details and corners

Electrical Contractor

Before rough-in.

  • Electrical layout
  • Heights
  • Conduits and wiring

Plumbing Contractor

Before rough-in.

  • Plumbing layout
  • Drainage and clean-outs
  • Materials and fittings

Why Plan Before You Build?

Correcting a mistake before it happens is easier and cheaper than discovering it after construction, then breaking it out and redoing it.

Without Pre-Planning

  • Each contractor works his own way, based on his own judgement.
  • The acceptance criteria aren't clear to him before he starts.
  • You discover mistakes after construction.
  • Redoing work costs you time and money, and disputes with the contractor grow.

With Pre-Planning

  • Our engineers sit down with the contractor on site before he starts.
  • We agree with him on the construction method according to good practice.
  • He knows how his work will be inspected before he starts.
  • Fewer mistakes, and less rework.

What We Agree On

We review the subcontractor's proposed construction method with him, and agree on these points before starting.

01

Acceptance Criteria

We explain to the contractor how his work will be inspected, before he starts.

02

Drawings

Reviewing the drawings and element locations with the contractor.

03

Construction Method

The correct method according to good practice, such as how to install clean-outs.

04

Materials

Material types and how to use them.

05

Inspection Dates

When we come back to inspect before each covering.

Then We Inspect the Work Against the Same Standards

The same standards we agreed with the contractor are the ones we use to inspect his work in the construction stage inspections.

Construction Stage Inspections

How It Works

From booking to the start of construction.

  1. Book

    Tell us the stage, the subcontractor and the work start date.

  2. We Schedule

    We agree with you and the contractor on a session date before starting.

  3. On-Site Session

    Our engineers sit down with the contractor and review the construction method.

  4. Recommendations

    The agreed construction method and technical recommendations.

    Report
  5. Work Begins

    The contractor starts knowing exactly what's required of him.

A Report Showing What Was Agreed

  • Construction MethodHow well the proposed method meets the standards.
  • Technical RecommendationsTo improve the work method before actual work begins.
  • Contractor ReadinessWhether the contractor is ready to build to the required quality.

Who Is This Service For?

For every owner building their own home and contracting subcontractors.

Building as an Owner-Builder

And contracting each subcontractor separately.

A New Stage Is About to Start

And you want the contractor to know what's required before he starts.

Tired of Rework

And you want to avoid mistakes from the start instead of discovering them after construction.

Where Does This Service Fit?

Three services that follow the subcontractor from before contracting to handover.

What you getEvaluationBefore ContractingThis Service
Pre-PlanningBefore Work Starts
Construction Stage InspectionDuring and After Construction
GoalChoose the right contractorStart the right wayInspect his work after construction
Visit by our engineersYesYesYes
ReportYesYesYes
Price600 AEDFrom 500 AEDFrom 700 AED

Frequently Asked Questions

About Pre-Planning.

When should I request pre-planning?

Before the subcontractor starts work on the stage, so we agree with him on the standards from the start.

Is the session on site?

Yes, our engineers sit down with the contractor on site and review the construction method with him.

How much does the service cost?

From 500 AED, a fixed price per stage whatever the subcontractor.

Does the service include inspecting the work after construction?

No, the work is inspected in the construction stage inspections, against the same standards we agreed with the contractor.

What's the difference between this and the subcontractor evaluation?

The evaluation is before contracting, so you choose the right contractor, while pre-planning is after contracting and before work starts.

Have a New Stage About to Start?

Tell us the stage and the subcontractor, and we'll arrange a session date with you before work starts.