Adding water to the mix
High- Cause:
- To ease pouring or because the truck was delayed.
- Impact:
- Concrete weaker than specified in the drawing.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
Columns transfer the loads of the whole house to the footings. We attend the pour and check the concrete and how it is placed and compacted, then return after the formwork is stripped to inspect every column. And if you deal with the contractor directly, we sit with them before the pour and set the plan.
From 700 AED
Column concreting is the pour of the columns that transfer the house's loads to the footings. The column concreting inspection takes place on pour day itself and then after the formwork is stripped, and our engineers make sure the concrete matches the specification and was placed, compacted and cured properly.
The inspection matters because a column is poured into a tall, closed formwork, so you can't see the concrete as it goes in. Any insufficient compaction or shifting formwork shows up after stripping as honeycombing or lean, and it is difficult to fix.
Start with planning with the contractor before pour day, then we attend during the pour and return after the formwork is stripped. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Concrete Contractor starts work.
The Fahison team meets the concrete contractor on site before the column pour day to arrange the pour step by step: the concrete type, pump and vibrators, samples, and the curing method after the pour, so there is no improvisation during the pour.
The required strength grade according to the structural drawing, and the supplying plant.
Pump, vibrators and enough workers for a continuous pour.
The height of each layer and the compaction method down to the bottom of the column.
Slump test and taking cube samples during the pour.
Method of water spraying or covering after the pour.
The pour date, and when we return after the formwork is stripped.
Quick decisions under pressure, such as adding water to the mix.
Fixing a concrete error after it has hardened is costly.
Requirements are clear and agreed before the pour, not after.
When: During the column pour, from the arrival of the first concrete truck to the end of the pour.
A column is poured into a tall, closed formwork, and you can't see the concrete as it goes in. We make sure the concrete is what was specified, and that it is placed in layers and compacted all the way to the bottom of the column.
Concrete type and strength grade checked against the drawing, and the time it left the plant.
No water added to the mix after it arrives on site.
Carrying out the slump test to check the mix consistency.
Taking and numbering cube samples for strength testing in the lab.
Compacting every layer with a vibrator down to the bottom of the column.
No bulging or leaning of the formwork during the pour.
Swipe to see all problems →
When: After the column formwork is stripped, during the curing period.
Once the formwork is stripped, the column shows its true condition. We inspect its surface, plumbness and dimensions, and make sure curing is going properly, before slab works begin.
Column surface free of honeycombing, especially at the base.
No rebar or stirrups showing on the concrete surface.
Column lean checked with a spirit level.
Column dimensions and position on the gridlines according to the drawing.
Water spraying or wrapping the column after the formwork is stripped.
Column free of cracks.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Column Concreting.
Because the concrete falls from a height and the rebar is dense, so if each layer isn't compacted with a vibrator, voids collect at the bottom of the column.
Extra water makes pouring easier, but it reduces the concrete's strength once it hardens, so it ends up weaker than specified in the drawing.
Samples taken from the concrete during the pour and sent to the lab to confirm that the concrete's strength meets the specification.
An on-site session with the concrete contractor before pour day, where we agree on the concrete type, the pouring and curing method, and the inspection schedule. Ideal for owners dealing with subcontractors directly, from AED 500.
No, you can request either of them on its own. But both together cover the column pour from start to finish.
From AED 700.
Concrete Works.
Tell us the date, and we'll attend the pour and arrange the follow-up inspection with you.