Water added to the mix
High- Cause:
- To make pouring easier or because the truck was delayed.
- Impact:
- Concrete weaker than the drawings require.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
The slab is the biggest pour in the house, and after it you can't fix anything without breaking out. We attend the pour and check the concrete and how it is poured and compacted, then come back after the formwork is removed to inspect the slab. If you're dealing with the contractor directly, we sit down with them before the pour and set the plan.
From 700 AED
Slab concreting is the pour of the slab and beams together on top of the columns. The slab concreting inspection takes place on the day of the pour and again after the formwork is removed, with our engineers confirming the concrete meets the specification and was poured, compacted and cured correctly.
The inspection matters because the slab carries the floor above and protects the house from water. A pour stopped in the wrong place, neglected curing in the heat, or early prop removal all show up later as cracks, sagging or leaks.
Start with planning with the contractor before pour day, then we attend during the pour and return after the formwork is stripped. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Concrete Contractor starts work.
The Fahison team meets the concrete contractor on site before the slab pour day to plan the pour step by step: concrete type, pump and vibrators, samples, and curing method after the pour, so nothing is left to guesswork on the day.
The strength grade required by the structural drawings, and the supplying plant.
Pump, vibrators and enough workers for a continuous pour.
Pour sequence, construction joint location if work stops, and worker walkways over the rebar.
Slump test and cube sampling during the pour.
Method of water spraying or covering after the pour.
The pour date, and when we return after formwork removal.
Quick decisions under pressure, such as adding water to the mix.
Fixing a concrete error after it has hardened is costly.
Requirements are clear and agreed before the pour, not after.
When: During the slab pour, from the arrival of the first concrete truck to the end of the pour.
The slab is the biggest pour in the house, combining the beams, slab and services in one go. We confirm the concrete is as specified, the pour is continuous and well compacted, and the rebar and services don't move.
Concrete type and strength grade matched to the drawings, and the time it left the plant.
No water added to the mix after it arrives on site.
Carrying out the slump test to check the mix consistency.
Taking and numbering cube samples for strength testing in the lab.
Compacting the concrete in the beams and slab, especially where beams meet columns.
Slab thickness and surface level during levelling.
Swipe to see all problems →
When: After the slab formwork and props are removed.
After the formwork is removed, the underside of the slab and beams shows its true condition. We check for honeycombing, sagging and cracks before the slab is covered with plaster and gypsum.
Underside of the slab and beams free of honeycombing and exposed aggregate.
No rebar or cover spacers visible on the slab underside.
Slab underside flat, with no sagging of the slab or beams.
Slab and beams free of cracks.
Electrical conduits and openings in their places as per the drawings.
Props not removed before the time set by the structural engineer.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Slab Concreting.
The point where the pour stops and is continued later. If it isn't properly planned, it becomes a weak point in the slab.
As set by the project's structural engineer. Removing them early causes sagging or cracks in the slab.
Extra water makes pouring easier, but it lowers the concrete's strength once it hardens, so it ends up weaker than the drawings require.
Samples taken from the concrete during the pour and sent to the lab to confirm the concrete strength meets the specification.
An on-site session with the concrete contractor before pour day, where we agree on the concrete type, pouring method, curing and inspection schedule. Ideal for owners dealing directly with subcontractors, from 500 AED.
No, you can request either one on its own. But together they cover the slab pour from start to finish.
From 700 AED.
Concrete Works.
Tell us the date, and we'll attend the pour and arrange the follow-up inspection with you.