Widely spaced or weak hangers
High- Cause:
- Saving on materials or quick fixing.
- Impact:
- Sagging ceiling and cracks over time.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
From the hangers and metal frame above the ceiling, to the gypsum boards and their joints, to the final inspection before painting. We inspect what will disappear above the ceiling before it is closed. And if you are dealing with the gypsum contractor directly, we sit down with them before work begins and set the plan.
From 700 AED
A suspended gypsum ceiling is installed below the concrete slab and hides the AC ducts and services above it. It consists of hangers and a metal frame, then gypsum boards whose joints are treated before painting. Gypsum inspection is an engineering visit in which our engineers check the strength of the frame and the quality of the installation.
The inspection matters because what counts most in gypsum disappears above the ceiling: weak hangers cause sagging, missing access panels mean breaking the ceiling whenever the AC fails, and joints without tape crack after painting.
Start with pre-planning with the gypsum contractor before work begins, then each inspection at the right time. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Gypsum Contractor starts work.
Our engineers sit down with the gypsum contractor on site before work begins to unify standards, explain quality requirements and agree on the correct method of execution, so you avoid common mistakes and guesswork from the start.
We explain to the contractor how their work will be inspected, before they start.
Ceiling level and decorative details as per the drawings.
Spacing between hangers and metal channels.
Access panel locations beneath ducts and valves.
Moisture-resistant boards in bathrooms and kitchens.
When we return to inspect the frame, the boards, and for the final inspection.
Every contractor installs their own way if you haven't agreed on standards.
A forgotten access panel means breaking the ceiling at the first fault.
Requirements are clear and agreed before the work, not after.
When: After the hangers and metal frame are installed, and before the gypsum boards go up.
The frame is what carries the ceiling, and once the boards are installed you can't see it. Any weak hanger or excessive spacing is corrected now, without taking the ceiling down.
Fixing to the concrete slab and spacing between them.
Frame checked level with a laser before boarding.
Channel spacing and how they are fixed together.
Electrical and AC installations completed before closing.
Duct insulation and AC condensate drainage above the ceiling.
Locations set beneath ducts and equipment.
Swipe to see all problems →
When: After the gypsum boards are installed, and before jointing compound and joint treatment.
Here we check board type, fixing and the joints between boards. Treating joints correctly is what prevents cracks after painting.
Moisture-resistant boards in bathrooms and kitchens.
Screw spacing and no protruding screws.
Joints between boards and their layout.
Opening sizes and locations as per the drawings.
Ceiling level and height from the floor.
Broken or damp boards.
Swipe to see all problems →
When: After joint treatment and compound, and before painting.
The last chance before paint covers up the defects. We check the joints, flatness and openings, and that the ceiling is ready for painting.
Tape and compound on every joint.
Ceiling checked with side lighting.
Straight edges, openings and concealed lighting.
Covers installed and easy to open.
Any cracks at joints or where the ceiling meets the wall.
Damp stains indicating a leak above the ceiling.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Gypsum Inspection.
Because the hangers and metal frame disappear once the ceiling is closed, and they are what carries the ceiling. Correcting them before boarding is easy; afterwards it means taking the ceiling down.
An on-site session with the gypsum contractor before they start, where we agree on quality standards, the method of execution and inspection dates. Ideal for owners dealing with subcontractors directly, from 500 AED.
No, you can request any one of them on its own. But all 3 together cover the whole stage, because the frame can't be inspected once the ceiling is closed.
Because the AC ducts and valves above the ceiling need maintenance. Without access panels, any fault means breaking the ceiling and redoing the gypsum and paint.
From 700 AED.
Finishing Works.
Book the frame inspection before the boards are installed, and we'll arrange the visit time with you.