Waviness visible under lighting
High- Cause:
- Uneven filler or rushed sanding.
- Impact:
- Clearly visible after painting in sunlight and under spotlights.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
From filler and sanding, to the primer, to the final coat. We uncover waviness, patches and moisture before you accept the walls from the painter. And if you are dealing with the painter directly, we sit down with them before work begins and set the plan.
From 700 AED
Paint is the last visible layer of a wall. It consists of filler that levels the surface, then a primer, then 2 or more coats of paint. Paint inspection is an engineering visit in which our engineers confirm that each layer is applied correctly before the next one.
The inspection matters because paint defects appear after you move in: waviness shows in sunlight and under spotlights, trapped moisture causes peeling and bubbles, and unsanded filler leaves visible marks on the wall.
Start with pre-planning with the painter before work begins, then each inspection at the right time. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Painting Contractor starts work.
Our engineers sit down with the painting contractor on site before work begins to unify standards, explain quality requirements and agree on the correct method of execution, so you avoid common mistakes and guesswork from the start.
We explain to the contractor how their work will be inspected, before they start.
Filler doesn't start until the plaster has dried sufficiently.
Filler, primer and the agreed number of paint coats.
How the surface is checked with side lighting before each coat.
Covering tiles, doors and windows before painting.
When we return to inspect the filler, the first coat, and for the final inspection.
Every painter works their own way if you haven't agreed on standards.
Scraping off and redoing paint costs far more than correcting the filler.
Requirements are clear and agreed before the work, not after.
When: After filler and sanding, and before the primer coat.
The filler defines the final look of the wall. Any waviness or sanding marks show up here under side lighting and are easy to fix before the paint covers them.
Measuring moisture before the coats begin.
Surface checked with side lighting to reveal waviness.
Surface is smooth and free of trowel marks.
Cracks are treated before filling, not just covered over.
Straight corners and opening edges.
Finishing around doors, windows and electrical boxes.
Swipe to see all problems →
When: After the primer and the first coat of paint.
The first coat reveals defects that weren't visible in the filler. Correcting them now is easier than after the final coat.
Primer covers the entire surface.
Revealing what didn't show in the filler after the first colour.
Bubbles or blistering that indicate moisture.
Consistent thickness without runs or build-up.
Tiles, doors and windows protected from paint.
Behind doors, the tops of walls and around ceilings.
Swipe to see all problems →
When: After the final coat, and before you accept the work from the painter.
The last chance before handover. We make sure the colour is even and the surface is clean, and that defects have been fixed before the painter leaves the site.
One even colour without patches or differences between walls.
Streaks or uneven texture.
Straight dividing lines between colours and the ceiling.
Detecting any peeling or damp stains.
Tiles, doors and switches free of paint.
Confirming that observations from previous inspections have been fixed.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Paint Inspection.
Because paint reflects light more than filler, so any small waviness shows under side lighting. That's why we check the filler with side lighting before painting.
An on-site session with the painting contractor before they start, where we agree on quality standards, the method of execution and inspection dates. Ideal for owners dealing with subcontractors directly, from 500 AED.
No, you can request any one of them on its own. But all 3 together cover the whole stage, because filler defects are hard to treat after the final coat.
The best time for the first inspection is after filler and sanding and before the colours, and the final inspection after the last coat and before you accept the work.
From 700 AED.
Finishing Works.
Book the filler inspection before the colours go on, and we'll arrange the visit time with you.