Pool Water Leak
High- Cause:
- Incomplete waterproofing or loose joints.
- Impact:
- Water loss and damp around the pool.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
A pool combines water, electricity and equipment, and any fault in it is costly and dangerous. We take handover after finishing and commissioning, checking the tiles, levels, filtration, lighting and safety requirements.
From 700 AED
The swimming pool inspection is an engineering visit after the pool is finished and filled and its equipment is running, in which our engineers check the tiles, grouting and edges, the operation of the filtration, pumps and lighting, and the safety requirements.
The inspection matters because pool problems appear after use: a leak that makes the water level drop, tiles coming loose, weak filtration that clouds the water, or electrics without adequate protection around the water. Fixing them means draining the pool.
We inspect the pool once at handover, after finishing and commissioning.
When: After the pool is finished and filled and the equipment is running.
We run the pool and inspect it before you take handover, because fixing any fault after use requires draining the water.
Tiles firmly fixed and grouting complete without gaps.
Level edges and water level in line with the skimmer.
Stable water level and no leaks.
Pumps, filters and plant room operating.
Lighting working, electrical protection and earthing.
Steps, depths and main drain covers.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Pool Inspection.
After the pool is finished and filled and the equipment is running, and before taking it over from the contractor.
Yes, we inspect the pumps, filters and connections in the plant room.
From AED 700.
Exterior & Landscaping.
Book the handover before you take over from the contractor, and we'll arrange the visit time with you.