Water pooling at entrances
High- Cause:
- Wrong falls towards the house.
- Impact:
- Water ingress and damp in the walls.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
Yard, walkway and parking flooring has to withstand sun, rain and car traffic. We take handover after installation and check the falls, drainage and level, and that there are no dips or loose pavers.
From 700 AED
Exterior flooring is the interlock, exterior tiles and stone in the yard, walkways and parking areas. The exterior flooring inspection is an engineering visit after installation, where our engineers check the falls, level, and stability of the pavers and kerbs.
The inspection matters because exterior flooring mistakes show up with the first rain or months after cars start using it: water pooling at the entrance, sunken interlock, or pavers shifting and coming loose.
We inspect the exterior flooring once at handover, after installation.
When: After the interlock or exterior tiles are installed, and before taking handover from the contractor.
Falls and levels matter most in exterior flooring. We check them before you take handover, because correcting them later means lifting and relaying the flooring.
Falls directed away from the house and towards drainage points.
A flat surface with no dips or bumps.
Even joints filled with sand.
Kerbs straight and secure.
No loose or broken pavers.
Flooring level at the house doors and garage.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Exterior Flooring.
Because rain and washing water must drain away from the house. Wrong falls pool water at entrances and walls.
After installation is complete, and before planting and taking handover of the work from the contractor.
From 700 AED.
Flooring & Cladding.
Book the handover before planting, and we'll arrange the visit time with you.