Wall off the gridline
High- Cause:
- Gridlines not checked before building.
- Impact:
- Changed room sizes and finishing problems.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
From setting out wall locations and the first course, to mortar filling, wall ties and lintels, to the final inspection before plaster. And if you deal with the blockwork contractor directly, we sit with them before work begins and set the plan.
From 700 AED
Blockwork is the walls that divide the home and enclose it from outside, built after the concrete structure. A blockwork inspection is an engineering visit in which our engineers make sure the walls are in the right place according to the drawing, and built solid and straight.
The inspection matters because blockwork mistakes get buried under the plaster: a wall off the gridline changes the room size, missing wall ties cause cracks at the columns, and a short lintel causes cracks above doors and windows.
External walls must be built with thermally insulated blocks, and after construction you can't tell them apart from hollow blocks by eye. With the thermal camera we see the temperature difference inside the wall and identify non-compliant walls before plaster covers them.
Book Blockwork Inspection«We had no idea that half of the external walls weren't insulated blocks. If it weren't for your inspection identifying the non-compliant walls, nobody would have known, and we'd have been stuck with the heat once we moved in.»
Salem Al Shamsi, Fahison client
Start with planning with the blockwork contractor before work begins, then the inspections at the right time. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Blockwork Contractor starts work.
Our engineers meet the blockwork contractor on site before work begins to align standards, explain quality requirements and agree on the correct method of execution, so you avoid common mistakes and personal improvisation from the start.
We explain to the contractor how their work will be accepted, before they start.
Reviewing wall, door and window locations against the drawing.
The required block for each wall, and how to mix the mortar.
Wall tie locations at the columns, and lintel bearing length.
Leaving routes for electrical and plumbing instead of random chasing.
When we return for the start of construction, during construction and the final inspection.
Every contractor builds their own way if you haven't agreed on standards.
A wall in the wrong place gets demolished; correcting it before building is cheaper.
Requirements are clear and agreed before work, not after.
When: When the first 2 courses are laid, before the wall rises.
The first course sets everything that follows. An error in alignment or level here multiplies as the wall rises, and correcting it now is far easier than demolishing later.
Gridlines and room dimensions checked against the drawing.
Positions and widths of doors and windows.
Block type and thickness checked against the drawing for every wall.
Levelness of the first course using a laser and spirit level.
Waterproofing layer under the first course where required.
Mix consistency and mortar thickness under the course.
Swipe to see all problems →
When: Once the walls are rising, before they reach the slab.
This is where workmanship shows: mortar filling, wall ties and lintels. All of them disappear inside the wall and under the plaster afterwards.
Making sure the wall is not leaning, using a spirit level and plumb bob.
Horizontal and vertical joints between blocks fully filled.
Vertical joints staggered between courses.
The wall tied to the columns at regular intervals.
A lintel above every opening, with enough bearing length on both sides.
The wall straight in plan without bulging.
Swipe to see all problems →
When: After blockwork and services are complete, before plastering begins.
The last chance to see the wall before plaster covers it. Any wrongly sized opening or random chasing for services is easy to fix now.
Width, height and levels of door and window openings.
Final check of the walls with a straightedge and spirit level.
Filling the gap between the wall and the beam or slab.
Chasing for pipes and boxes, its depth and how it is repaired.
Excess mortar removed from walls and floor.
Any cracks in the blockwork or at the columns before covering.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Blockwork Inspection.
No. Some cracks are superficial in the mortar, but diagonal cracks above openings or at columns need assessment by our engineers to find the cause before plastering.
An on-site session with the blockwork contractor before they start, where we agree on quality standards, the method of execution and the inspection schedule. Ideal for owners dealing with subcontractors directly, from AED 500.
No, you can request any of them on its own. But all three together cover the whole stage, because first-course mistakes, for example, are hard to spot once the wall has risen.
The best time for the first inspection is when the first 2 courses are laid, and the final inspection after blockwork and services are complete and before plaster.
Yes, our engineers go over the home's walls according to the agreed inspection scope.
From AED 700.
Finishing Works.
Book the inspection before the wall rises, and we'll arrange the visit with you.