Part of Construction Stage Inspection

Concrete Works Inspection
During and After the Pour

Concrete quality is decided on pour day: added water, vibration and sampling. The Fahison team attends the pour of the footings, tie beams, columns and slab, then inspects the concrete after the formwork is removed.

From 700 AED

  • Specialised Engineers
  • Detailed Report After Every Inspection
  • All Emirates

Inspection Items: Concrete Works

Each item has supervision during the pour and an inspection after it. Tap "Details" to see what we check in each item.

Item 1

Footing Concreting

  • Pour supervision and slump test
  • Cube samples and vibration
  • Honeycombing and curing after the pour
From 700
Item 2

Tie Beam Concreting

  • Delivery tickets and no added water
  • Rebar and starter bars held in place during the pour
  • Dimensions and level after the pour
From 700
Item 3

Column Concreting

  • Vibration and stable formwork
  • Plumb and grid lines after the pour
  • Honeycombing and exposed rebar
From 700
Item 4

Slab Concreting

  • Slab thickness and level during the pour
  • Deflection and flatness after the pour
  • Cracks and when the props come out
From 700

Not sure which pour is next on your project? Send us a photo on WhatsApp and we'll help you.

Why Inspect the Concrete?

Concrete cannot be redone. What happens on pour day stays in the structure of your home.

Concrete Strength

No water added on site, and cube samples taken for testing.

No Honeycombing

Proper vibration prevents voids around the rebar.

Matches the Drawings

Dimensions, levels and plumb after the formwork is removed.

A Clear Decision

A report that helps you ask the contractor for remedies in time.

Weak concrete doesn't show from the outside. Supervision on pour day is the only chance to prevent it.

How Does the Service Work?

From the first message to receiving the report.

  1. Book via WhatsApp

    Tell us the pour date and where the project is.

  2. We Attend the Pour

    We follow the delivery, slump, samples and vibration.

  3. After-Pour Inspection

    After the formwork is removed we check honeycombing, dimensions and curing.

  4. You Receive the Report

    A PDF report with observations, photos and technical recommendations.

See Your Inspection Results As If You Were on Site

The interactive report is included in the fee for every inspection, and you can add the 3D model or 360 tour for an additional fee.

Home floor plan marked with inspection observations Included in the inspection fee

Interactive Report

Browse your inspection results item by item, and open each observation to see its photo, its impact on your home and how to fix it.

Learn More
3D model of a modern villa marked with observations Additional fee

Walk Through Your Home in 3D

A 3D model of your home where you can track its condition and all its inspections, with every observation pinned to its actual location.

Learn More
360-degree image of a modern villa living room, with three color-coded inspection finding markers Tap the markers · Illustrative example
Additional fee Coming Soon

360° Site Tour

Coming soon: walk through your property in 360-degree images captured by the Fahison team during the inspection, with observations shown right on the wall or floor.

Coming Soon
View a Sample Fahison ReportWith every inspection, the client receives a PDF report to save, print and send to the contractor. Browse selected pages from a sample report.
Sample Fahison report1 / 5
A page from the sample Fahison report: Report cover and property details
Report cover and property details
A page from the sample Fahison report: Summary of inspection results and overall score
Summary of inspection results and overall score
A page from the sample Fahison report: Example of a detailed finding with photos and recommendation
Example of a detailed finding with photos and recommendation
A page from the sample Fahison report: Rating criteria for items and sections
Rating criteria for items and sections
A page from the sample Fahison report: Final rating and engineering conclusion
Final rating and engineering conclusion

Selected pages from a sample Fahison report. The client receives the full report after the inspection.

Frequently Asked Questions

About Concrete Works Inspection.

When should I book?

Early enough before the pour date for us to arrange attending on pour day; we then come back after the formwork is removed.

Do I book the pour supervision and the after-pour inspection together?

Each item has two visits: during the pour and after it. Each item's details are on its own page.

How much does the inspection cost?

Each item inspection starts from AED 700.

Do you cover all emirates?

Yes, we provide the service across all emirates of the UAE.

Have a Pour Coming Up?

Message us on WhatsApp with the pour date and we'll arrange to attend.

Book Now