The slab combines rebar, beams and services in a single pour, after which nothing can be fixed without breaking out. We take handover of the formwork, then the rebar, then the cover spacers and cleanliness before the pour. And if you are dealing with the contractor directly, we sit down with them before work starts and set the plan.
From 700 AED
The concrete slab is poured together with the beams in a single pour, and carries the floor above or the roof. The slab inspection is an engineering visit before the pour, in which our engineers check the rebar, formwork, props and services within the slab.
The inspection matters because the slab is the largest pour in the house, and its mistakes are costly: sagging top reinforcement causes cracks, weak props cause sagging, and forgotten electrical conduits mean breaking into the slab after the pour.
Start by planning with the contractor before work begins, then the inspections before the pour. Each service can be booked on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Formwork & Rebar Contractor starts work.
Our engineers meet the formwork and rebar contractor on site before work begins to align standards, explain quality requirements and agree on the correct method of execution, so you avoid common mistakes and guesswork from the start.
We explain to the contractor how their work will be accepted, before they start.
Slab thickness, beam dimensions and bar diameters.
Spacing, and the chairs that support the top reinforcement.
Prop spacing and stability under the slab.
Coordinating electrical conduits and openings before the pour.
When we come back for handover before each step, and before the pour.
Every contractor does things their own way if you haven't agreed on standards.
A structural mistake after the pour means costly breaking out or strengthening.
Requirements are clear and agreed before work starts, not after.
When: After the slab formwork, beams and props are installed.
The formwork and props carry the weight of the concrete while it is wet. Any weakness in them causes the slab to sag or deform.
Slab level and underside of beams.
Width and depth according to the drawing.
Spacing, stability and bases.
No gaps between the panels.
Slab openings (stairs, light wells) in the right place.
Slab edges and projections.
Swipe to see all problems →
When: After the slab reinforcement is laid and the beam rebar installed.
The slab and beam rebar disappear in a single pour. We check diameters, spacing and the position of the top reinforcement before the pour.
Slab and beam rebar according to the drawing.
Spacing between bars in both directions.
Its position over beams and columns, and its length.
Chairs in place to support the top reinforcement.
Diameters, spacing and closer spacing zones.
Lap lengths and locations.
Swipe to see all problems →
When: Immediately before the slab pour.
The last chance before the pour. Cover spacers maintain the concrete cover beneath the rebar, the slab must be clean, and the services complete.
Their distribution under the slab and beam rebar.
Free of dust, debris, wood offcuts and wires.
Complete and secured before the pour.
Sleeves and openings in their positions.
Rebar tied and not moving.
Confirming that rebar and formwork observations have been rectified.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Slab Inspection.
The top reinforcement over beams and columns resists tension at the top of the slab. If it sags because chairs are missing, the slab is weakened and cracks appear above the beams.
An on-site session with the formwork and rebar contractor before they start, where we agree on quality standards, method of execution and inspection dates. Suitable for owners dealing with subcontractors directly, from AED 500.
No, you can book any one of them on its own. But all three together cover the whole item before the pour.
2 to 3 hours.
From AED 700.
Formwork & Rebar.
Book the inspection before the pour, and we will arrange a visit time with you.