Stage 7: Joinery & Aluminium

Door Inspection
After Installation

You open and close a door every day, and any installation fault shows with use. We take handover of the doors after installation and check the frame, hinges, closing and finish.

From 700 AED

1Single Handover Inspection
  • Specialised Engineers
  • Photo Report
  • All Emirates

What Is Door Inspection?

The doors inspection is an engineering visit after interior and exterior doors are installed, where our engineers check the installation of the frame, leaf, hinges and locks, as well as opening, closing and finish.

The inspection matters because door defects appear after you move in: a door that scrapes the floor or won't close, hinges that sag over time, or a leaning frame that stands out in the wall. Fixing them after handover means removing and reinstalling.

Handover of Doors

We inspect the doors once at handover, after installation.

Single Inspection

Doors Handover

When: After the doors, locks and accessories are installed.

Once you take handover from the contractor, any fault becomes your responsibility. We check the installation and operation while you can still ask the contractor to fix things.

Book This Inspection

Key Items We Inspect

Alignment

Door frame plumb and aligned in the wall.

Opening and Closing

Door opens and closes easily without rubbing.

Hinges

Number of hinges, their fixing, and no sagging of the door leaf.

Locks and Handles

Locks, handles and keys working.

Gaps

Even gaps around and under the door leaf.

Finish

Doors free of scratches, damage and paint defects.

Most Common Problems at This Stage

Door rubbing on the floor or frame

Medium
Cause:
Uneven installation or insufficient clearance.
Impact:
Hard to open, damaging the floor and door.

Leaning frame

High
Cause:
Fixed without a spirit level.
Impact:
A door that doesn't close properly.

Weak hinges

Medium
Cause:
Too few hinges or poor fixing.
Impact:
Door leaf sagging over time.

Equipment We Use

From the Fahison equipment featured on our home page.

Spirit LevelTape Measure

Tips Before the Inspection

To help you get more out of the visit.

Do
  • Request the handover before the final payment to the contractor.
  • Try every door and key before handover.
  • Make sure bathroom doors are moisture-resistant.
Avoid
  • Installing doors before the flooring is finished.
  • Taking handover of doors without testing the locks.
  • Leaving doors unprotected during painting.

Frequently Asked Questions

Common questions about Door Inspection.

When should I request the doors inspection?

After the doors and locks are installed, and before taking handover from the contractor.

Does the inspection include exterior doors?

Yes, it covers both interior and exterior doors.

How much does the doors inspection cost?

From 700 AED.