Stage 7: Joinery & Aluminium

Window Inspection
After Installation

Windows protect the house from dust, heat and rain. We take handover after installation, checking the frames, glazing, closing and silicone, and making sure there are no water or dust leaks.

From 700 AED

1Single Handover Inspection
  • Specialised Engineers
  • Photo Report
  • All Emirates

What Is Window Inspection?

The windows and aluminium inspection is an engineering visit after the aluminium windows and doors are installed, in which our engineers check the fixing of frames and glass, opening and closing, and the silicone and weep holes.

The inspection matters because window defects show up with the first dust or rain: water leaking down the wall, dust getting into the house, or a window that does not close properly. All of these affect your comfort and your air conditioning bill.

Handover of Windows and Aluminium

We inspect the windows and aluminium once at handover, after installation.

Single Inspection

Windows and Aluminium Handover

When: After the frames, glazing and silicone are installed.

We make sure the windows are well sealed and work properly before you take handover, because leaks and dust show up after you move in.

Book This Inspection

Key Items We Inspect

Frame Fixing

Frame secured in the wall and plumb.

Silicone

Silicone complete around the frame, inside and out.

Opening and Closing

Windows open and close easily and seal tightly.

Locks

Locks and handles working.

Glass

Glass free of breaks and scratches and matching the specifications.

Weep Holes

Drainage weep holes present and not blocked.

Most Common Problems at This Stage

Water Leaking Around the Window

High
Cause:
Incomplete silicone or loose fixing.
Impact:
Damp and stains on the wall.

Window Not Closing Properly

Medium
Cause:
Out-of-square frame or misadjusted rollers.
Impact:
Dust and heat getting in.

Blocked Weep Holes

Medium
Cause:
Construction residue or silicone.
Impact:
Water collecting and entering the house.

Equipment We Use

From the Fahison equipment featured on our home page.

Spirit LevelTape Measure

Tips Before the Inspection

To help you get more out of the visit.

Do
  • Request the handover before the final paint.
  • Try opening and closing every window.
  • Ask the contractor for the glass and profile specifications.
Avoid
  • Removing the protective film from frames before the works are finished.
  • Sealing weep holes with silicone.
  • Accepting windows without testing the locks.

Frequently Asked Questions

Common questions about Window Inspection.

When should I request the windows inspection?

After the frames, glazing and silicone are installed, and before taking them over from the contractor.

Does the inspection include aluminium doors?

Yes, it covers windows, aluminium doors and sliding doors.

How much does a windows and aluminium inspection cost?

From AED 700.

Windows Installed?

Book the handover before you take over from the contractor, and we'll arrange the visit time with you.

Book Window Inspection