Hollow tiles
High- Cause:
- Insufficient or unevenly spread adhesive under the tile.
- Impact:
- Tiles cracking over time and with foot traffic.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
You see the tiles, marble and ceramics on your floors and walls every day. We take handover after installation and check flatness, falls and joints, and that there are no hollow or broken tiles.
From 700 AED
Interior flooring and wall cladding are the tiles, marble, ceramic and porcelain on floors and on bathroom and kitchen walls. The flooring inspection is an engineering visit after installation, where our engineers check the quality of installation and finish before the work is handed over from the contractor.
The inspection matters because tile defects stay with you for years: hollow tiles crack over time, wrong falls pool water in the bathroom, and uneven joints spoil the look of the home. Fixing them after handover means breaking out and replacing tiles you may not find in the same colour.
We inspect the tiles and cladding once at handover, after installation.
When: After the tiles are laid and grouted, and before taking handover from the contractor.
Once you take handover from the contractor, any defect becomes your responsibility. We check the installation and finish while you can still ask the contractor to fix things.
Tiles flat with no lippage between them.
Falls towards the drains in bathrooms, kitchens and balconies.
Checking tiles for voids underneath (hollow tiles).
Even joint widths and complete grouting.
Cladding plumb with straight courses.
Tiles free of cracks, scratches and colour variation.
Tile cuts around pipes, sockets and corners.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Interior Flooring.
Tiles with a void underneath due to insufficient adhesive, recognisable by their sound when tapped. Over time they crack or come loose.
After installation and grouting are complete, and before taking handover of the work from the contractor.
From 700 AED.
Flooring & Cladding.
Book the handover before you take over from the contractor, and we'll arrange the visit time with you.