Loose stones
High- Cause:
- Missing anchors or insufficient adhesive.
- Impact:
- Risk of stones falling over time.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
Facade stone is the first thing people see on your home, and it is heavy and hung on the wall. We sit down with the stone contractor before work begins to agree on the standards, then inspect the installation for fixing, alignment and joints.
From 700 AED
Facade stone is the cladding of a home's exterior walls with natural or engineered stone. Facade stone inspection starts with pre-planning with the stone contractor before work begins, followed by a handover visit after installation in which our engineers check fixing, alignment, joints and finishing.
The inspection matters because stone is heavy and hung at height, and any weakness in its fixing is a danger to people. Facade defects such as crooked stones and uneven joints stay visible forever, and fixing them is costly once the scaffolding has been taken down.
Start with pre-planning with the stone contractor before work begins, then the handover inspection after installation. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Stone Contractor starts work.
Our engineers sit down with the stone contractor on site before work begins to unify standards, explain quality requirements and agree on the correct method of execution, so you avoid common mistakes and guesswork from the start.
We explain to the contractor how their work will be inspected, before they start.
Type, number and position of anchors for each stone.
Sizes, stone orientation and joint width.
Finishing at corners, windows and edges.
When we return to inspect the stone before the scaffolding is removed.
Every contractor does it their own way if you haven't agreed on standards.
Correcting stone after installation means removing stones and damaging some of them.
Requirements are clear and agreed before the work, not after.
When: After the stone is installed, and before the scaffolding is taken down.
The scaffolding is your only chance to reach every stone. We check the fixing and finish before it comes down, because putting it back up is costly.
Stones are secure and anchors are installed as agreed.
Stone courses are straight and plumb.
Joint width is consistent and joints are fully filled.
Stones are free of breaks, cracks and colour variation.
Finishing at corners, windows and edges.
Facade is clean of adhesive and mortar residue.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Facade Stone.
An on-site session with the stone contractor before they start, where we agree on quality standards, the fixing method and handover inspection dates. Ideal for owners dealing with contractors directly, from 500 AED.
After the stone is installed and before the scaffolding is removed.
From 700 AED.
Flooring & Cladding.
Book pre-planning before work begins, or the handover inspection before the scaffolding comes down.