Bar diameter smaller than the drawings
High- Cause:
- Saving on materials or a reading error.
- Impact:
- A weak footing that cannot carry the loads.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
The footings carry the whole house, and after the pour you can neither see the rebar nor fix it. We inspect the rebar, then the formwork, then the cover spacers and cleanliness right before the pour. And if you are dealing with the contractor directly, we sit down with them before work begins and set the plan.
From 700 AED
Footings are the first thing poured in a house, and the columns and all the loads rest on them. Footings inspection is an engineering visit before the pour in which our engineers confirm that the rebar and formwork are built according to the structural drawings.
The inspection matters because footing mistakes get buried under concrete and soil: a smaller bar diameter, column starter bars out of position, or rebar without concrete cover that rusts over time. None of these can be fixed after the pour except at great cost.
Start with planning with the contractor before work begins, then the inspections in order before the pour. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Formwork & Rebar Contractor starts work.
Our engineers meet the formwork and rebar contractor on site before work begins to align standards, explain quality requirements and agree on the correct method of execution, so you avoid common mistakes and guesswork from the start.
We explain to the contractor how their work will be inspected, before they start.
Reviewing footing dimensions and bar diameters with the contractor.
Lap lengths and fixing of starter bars and stirrups.
How gridlines are set out and the footing levels.
Spacer thickness and positions under the rebar and on the sides.
When we return to inspect the rebar, the formwork, and before the pour.
Every contractor does it their own way if you haven't agreed on standards.
A footing mistake after the pour means costly breaking out or strengthening.
Requirements are clear and agreed before the work, not after.
When: After the footing rebar and column starter bars are installed.
The rebar is what carries the footing, and after the pour it disappears forever. We check bar diameters, spacing and laps before any next step.
Diameters match the structural drawings.
Spacing in both directions as per the drawings.
Lap lengths and locations.
Number, diameters and positions on the gridlines.
Number, spacing and fixing of stirrups.
Free of excessive rust, oil and dirt.
Swipe to see all problems →
When: After the formwork is installed around the footings.
The formwork defines the footing's shape, dimensions and position. If it is weak or the dimensions are wrong, the footing comes out with the same mistake after the pour.
Length, width and height as per the drawings.
Footing positions match the gridlines.
Top-of-footing level checked with a spirit level.
Formwork panels are firmly fixed to withstand the pour.
Sides are straight and plumb.
No gaps between the panels.
Swipe to see all problems →
When: Immediately before the footings are poured.
The last chance before the pour. Cover spacers maintain the concrete cover that protects the rebar from rust, and the footing must be clean of any debris before it is poured.
Presence, distribution and thickness under the mesh.
Distance between the rebar and the formwork sides.
Free of dirt, debris and pieces of wood.
Column starter bars are secured so they don't move during the pour.
A final check of the gridlines before the pour.
Confirming that rebar and formwork observations have been fixed.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Footings Inspection.
Small blocks placed under and beside the rebar that keep the distance between the rebar and the concrete surface (the concrete cover), so the rebar is protected from moisture and rust.
An on-site session with the formwork and rebar contractor before they start, where we agree on quality standards, the method of execution and inspection dates. Ideal for owners dealing with subcontractors directly, from 500 AED.
No, you can request any one of them on its own. But all 3 together cover the footings completely before the pour.
2 to 3 hours.
From 700 AED.
Formwork & Rebar.
Book the rebar inspection before the formwork goes up, and we'll arrange the visit time with you.