Widely Spaced Stirrups
High- Cause:
- Saving on steel or rushing.
- Impact:
- Weak beam and cracks under load.
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
Tie beams are ground beams that connect the footings to each other and carry the ground floor walls. We take handover of the rebar, then the formwork, then the cover spacers and cleanliness before the pour. And if you are dealing with the contractor directly, we sit down with them before work starts and set the plan.
From 700 AED
Tie beams (ground beams) are the beams that connect the footings to each other below ground level, prevent them from moving, and carry the ground floor walls. The tie beam inspection is an engineering visit before the pour, in which our engineers check that the rebar and formwork are executed according to the structural drawing.
The inspection matters because tie beam mistakes are buried underground: widely spaced stirrups, weak rebar anchorage at the columns, or rebar without concrete cover that rusts with moisture. They later show up as cracks in walls and floors.
Start with planning with the contractor before work begins, then the inspections in order before the pour. You can request each service on its own.
For: Owners who deal directly with subcontractors (owner-builders).
When: Before the Formwork & Rebar Contractor starts work.
Our engineers meet the formwork and rebar contractor on site before work begins to align standards, explain quality requirements and agree on the correct method of execution, so you avoid common mistakes and guesswork from the start.
We explain to the contractor how their work will be accepted, before they start.
Reviewing beam dimensions and bar diameters with the contractor.
Laps, stirrup spacing and anchorage at columns.
Top of tie beam level relative to the floor.
Spacer thickness and positions under the rebar and on the sides.
When we come back for handover before each step, and before the pour.
Every contractor does things their own way if you haven't agreed on standards.
A structural mistake after the pour means costly breaking out or strengthening.
Requirements are clear and agreed before work starts, not after.
When: After the tie beam rebar and stirrups are installed.
The rebar is what ties the footings together and carries the walls, and after the pour it disappears underground. We check it before the formwork.
Top and bottom reinforcement according to the drawing.
Diameters, spacing and closer spacing at columns.
Lap lengths and locations.
Rebar extending into the columns and footings.
Spacing between bars and its consistency.
Free of excessive rust, oil and dirt.
Swipe to see all problems →
When: After the formwork around the tie beams is installed.
The formwork sets the beam's dimensions, level and alignment. Any mistake in it shows in the concrete after the pour.
Width and depth according to the drawing.
Beams straight between footings.
Top of tie beam level.
Panels fixed firmly enough to withstand the pour.
No gaps between the panels.
Formwork sides plumb.
Swipe to see all problems →
When: Immediately before the tie beam pour.
The last chance before the pour. Cover spacers protect the rebar from soil moisture, and the beams must be clean of any debris.
Presence, distribution and thickness.
Distance between the rebar and the formwork sides.
Free of dust, debris and wood offcuts.
Rebar tied and not moving during the pour.
A final check before the pour.
Confirming that rebar and formwork observations have been rectified.
Swipe to see all problems →
From the Fahison equipment featured on our home page.
To help you get more out of the visit.
Common questions about Tie Beam Inspection.
Ground beams that connect the footings to each other, carry the ground floor walls and prevent the footings from moving.
An on-site session with the formwork and rebar contractor before they start, where we agree on quality standards, method of execution and inspection dates. Suitable for owners dealing with subcontractors directly, from AED 500.
No, you can book any one of them on its own. But all three together cover the whole item before the pour.
2 to 3 hours.
From AED 700.
Formwork & Rebar.
Book the rebar inspection before the formwork goes up, and we'll arrange the visit time with you.