Footings Inspection
- Bar diameters and spacing
- Footing formwork dimensions and levels
- Spacers and cleaning before the pour
Special Opening Offer: Limited-time discounts on inspection packages
Serving all UAE emirates
Rebar and formwork are the skeleton of your home before the pour. Once concrete is poured the rebar disappears and cannot be corrected, so the Fahison team inspects it in the footings, tie beams, columns and slab before every pour.
From 700 AED
Each item is inspected before its pour. Tap "Details" to see what we check in each item.
Swipe to see all items →
Not sure which item your contractor has reached? Send us a photo on WhatsApp and we'll help you.
Rebar and formwork mistakes get buried inside the concrete and can't be seen after the pour.
Bar diameters, count and spacing are what carry your home.
Dimensions, levels and grid lines per the structural drawings.
Fixing rebar before the pour is easy; after it, it means breaking.
One observation before the pour saves a costly repair after it.
After the concrete is poured the rebar cannot be seen, and correcting it means breaking.
From the first message to receiving the report.
Tell us which item is ready and where the project is.
After the rebar and formwork are finished, and before the pour.
Our engineers inspect the rebar and formwork with measuring tools and checklists.
A PDF report with observations, photos and technical recommendations.
The interactive report is included in the fee for every inspection, and you can add the 3D model or 360 tour for an additional fee.
Included in the inspection fee
Browse your inspection results item by item, and open each observation to see its photo, its impact on your home and how to fix it.
Learn More
Additional fee
A 3D model of your home where you can track its condition and all its inspections, with every observation pinned to its actual location.
Learn More
Coming soon: walk through your property in 360-degree images captured by the Fahison team during the inspection, with observations shown right on the wall or floor.
Coming SoonAbout Rebar & Formwork Inspection.
After the contractor finishes the rebar, formwork and spacers, and before the pour date.
No, each item has its time: footings, then tie beams, then columns, then the slab. You book each item when it is ready.
Each item inspection starts from AED 700.
Yes, we provide the service across all emirates of the UAE.
Message us on WhatsApp, tell us the item, and we'll arrange a visit time with you.